implementation-pipeline
A large software-delivery effort run as a standing responsibility graph instead of one long chat transcript: a fixed, wide fan-out of six parallel construction lanes with per-facet wake. The lesson is facet-level lane invalidation under a FIXED topology.
Standing goal. Every planning-corpus work item is built, reviewed, and integrated as a legible, auditable, memoized DAG; the planner may reassign what each lane builds, but it can never grow the graph.
One-line scenario. Planning docs + a repo snapshot + run config fan into a work plan that assigns work to six fixed lanes; a shared foundation flows into all six; a review gate rejects any unsafe lane; integration merges only the accepted lanes; verification and a report/signpost index close it out.
The invariant this teaches
The work plan may change lane CONTENTS; it may not mutate the GRAPH.
- Work the six fixed lanes cannot own becomes
unassigned_workon the work-plan's own truth (never a 7th mounted node). The expanded topology is frozen at 16 nodes.src/ships the 6 authored contracts and mounts 6 nodes on its own; the 16-node topology is what the reference harness's per-lane expansion produces from them (see the Harnesses section of the repository README). - A change to ONE lane's contents lights one lane; the five siblings stay dark (independent per-lane facet tokens).
- A change to the foundation fans out to all six lanes once: the intentional, auditable blast radius.
- A rejected lane never reaches integration.
DAG sketch
Planning Corpus (gateway: docs · repo · config)
|
v
Implementation Corpus
|
+-----------------------------+
v v
Implementation Work Plan Foundation Builder
(facet per lane) (shared-shapes facet)
| |
| v
| Foundation Review
| |
+-------------+---------------+ (each lane subscribes to ITS
| work-plan facet + the foundation)
+------+------+------+------+------+------+
v v v v v v
SDK SDK SDK Skill Examples Docs <- 6 FIXED construction lanes
World Runtime Compile Contract /Test /Signpost
+------+------+------+------+------+------+
|
v
Construction Review (accept / REJECT a lane)
|
v
Integration Builder (merges accepted lanes ONLY)
|
v
Verification Runner
|
+-------+-------+
v v
Signpost Index Implementation Report
16 mounted nodes in the expanded topology; the planning inbox is a phantom ingress edge, not a node.
Conformance expectations
A conforming harness proves the expanded topology never grows, extra work remains
unassigned_work, lane-local changes wake one lane, foundation changes wake all
six lanes once, rejected work never integrates, and quiet replay adds no fresh
cost.
Replay any run you produce
A run leaves a chain-verifiable state on disk that any conforming harness can replay keyless:
dispositions rendered=… · skipped=… · failed=0
surprise-cause external=… · input=…
cost rollup (tokens) … chain-verify ok
A replayed state holds the compiled topology and labels, the flat chain-verifiable receipt ledger, and the per-node world-models, walking the trajectory cold-boot → quiet → lane-local → foundation-fanout → review-blocks → quiet bookend.
Observable invariants
- Frozen artifacts. In one harness's replay layout,
compile/topology.jsonis a validTopologyWorldModel(16 expanded nodes, a single entry gateway,acyclic:true),labels.jsonis present,receipts.jsonis a flat root file, and eachworld-models/<hexNodeId>/holdspublished.json+versions/sha256_*.bin. - Dispositions. Cold-start renders all 16 expanded nodes; a byte-identical re-wake memo-SKIPS them (a skip carries zero fresh and wakes nothing).
cost.surprise_cause === wake.sourceon every receipt (read offctx.wake.source, never hardcoded).ATOMIC_FACETfor facet-less producers; no"*"token anywhere.- Chain-verify.
verifyReceiptChainpasses over every per-node chain. - Byte-determinism. A second generation yields identical
receipts.json/topology.json/labels.json/beats.json.
Plus the tenet, encoded as IP00–IP06:
- IP00: extra work is
unassigned_work, the expanded topology stays at 16 nodes. - IP03: a lane-local change lights one lane;
propagationTargetsconfirms the five siblings stay dark. - IP02: a foundation change fans out to all six lanes.
- IP04:
construction-reviewrejects the unsafe lane; the forbidden patch never appears in anyintegrated_patch_set. - IP06: a no-change replay memo-skips the whole graph;
costRollup.total.freshdoes not move on a quiet re-wake and DOES move when a memo key moves.